GrantExec, a Euna Solutions® company

Hurricane Helene State Revolving Fund (SRF) - Drinking Water and Clean Water

This funding opportunity provides zero-interest loans with principal forgiveness to local governments and eligible water corporations in North Carolina for repairing and improving water and wastewater infrastructure damaged by Hurricane Helene.

$10,000,000
Active
NC
Grant Description

The North Carolina Department of Environmental Quality (DEQ), through its Division of Water Infrastructure, is offering funding under the Hurricane Helene State Revolving Fund (SRF) program for both Drinking Water and Clean Water systems. This disaster-specific program provides zero-interest loans with 100 percent principal forgiveness, effectively functioning as grants, to assist communities affected by Hurricane Helene in repairing, rebuilding, and improving their water and wastewater infrastructure. The program draws from two federal State Revolving Fund capitalization grants: the Drinking Water State Revolving Fund (DWSRF Helene) with approximately 409 million dollars available and the Clean Water State Revolving Fund (CWSRF Helene) with approximately 253 million dollars available, totaling approximately 662 million dollars in combined funding. Eligible applicants include local government units and certain non-profit and investor-owned water and wastewater corporations affected by Hurricane Helene. Specifically, counties, cities, towns, sanitary districts, water and sewer authorities, metropolitan districts, and other units of local government may apply. Investor-owned drinking water corporations affected by Hurricane Helene are also eligible for DWSRF Helene funds. Projects must reduce flood risk and vulnerability at drinking water or wastewater treatment works, or enhance resiliency to rapid hydrologic change or natural disasters at treatment works. The maximum award under the CWSRF program is 5 million dollars per project, while the DWSRF program allows up to 10 million dollars per project. Project funding can carry 20- to 30-year loan terms based on the anticipated life of the infrastructure, and all funds must be spent within 5 years or by December 2031, whichever comes first. A cost share or matching requirement applies to this program. Recipients must comply with SRF federal crosscutter requirements, including Engineering Report approval, Environmental Review, federal and state procurement requirements, American Iron and Steel requirements, and Davis-Bacon Wage requirements. These crosscutters apply to the entire project. Notably, Build America, Buy America (BABA) Act requirements do not apply to SA-HMW funds. No duplication of benefits is allowed, meaning applicants cannot receive funding for the same costs from multiple disaster recovery sources. The application deadline is March 2, 2026, and this is a fixed deadline with no rolling submissions. Award announcement dates are staggered, with announcements on December 10, 2025, February 18, 2026, April 15, 2026, and April 16, 2026, indicating that applications are reviewed and awarded on a rolling basis as they are received even though the submission deadline is fixed. This is a one-time funding opportunity tied specifically to Hurricane Helene disaster recovery and is not expected to recur. Applicants must submit comprehensive narratives with supporting documentation, a priority rating system score sheet, affordability or handwritten affordability calculations, a financial information form, current water and sewer rate sheets, a fund transfer certification, and an application resolution by the governing body. Application forms and additional resources are available through the North Carolina DEQ Division of Water Infrastructure website. A webinar recording and slide presentation are available as resources to help applicants understand the program requirements and application process. Given the complexity of required documentation including engineering reports, environmental reviews, and federal compliance requirements, applicants should allow substantial time for preparation and should engage engineering and financial consultants early in the process.

Funding Details

Award Range

$5,000,000 - $10,000,000

Total Program Funding

$662,000,000

Number of Awards

Not specified

Matching Requirement

No

Additional Details

Two funding tracks: Clean Water State Revolving Fund (CWSRF Helene) with $253 million available and maximum $5 million per project, and Drinking Water State Revolving Fund (DWSRF Helene) with $409 million available and maximum $10 million per project. Zero-interest loans with 100% principal forgiveness. Project funding can have 20- to 30-year loan terms based on anticipated infrastructure life. All funds must be spent within 5 years or by December 2031, whichever comes first. SRF federal crosscutter requirements apply including Engineering Report approval, Environmental Review, American Iron and Steel, and Davis-Bacon Wage requirements. BABA requirements do not apply to SA-HMW funds. No duplication of benefits allowed.

Eligibility

Eligible Applicants

City or township governments
County governments
Special district governments
For profit organizations other than small businesses

Additional Requirements

Eligible applicants are local government units (LGUs) and certain water and wastewater corporations affected by Hurricane Helene. LGUs include counties, cities, towns, sanitary districts, water and sewer authorities, and metropolitan districts. Non-profit water and wastewater corporations affected by Hurricane Helene may also apply. Additionally, investor-owned drinking water corporations affected by Hurricane Helene are eligible for DWSRF Helene funds specifically. Projects must focus on reducing flood risk and vulnerability at drinking water or wastewater treatment works, or enhancing resiliency to rapid hydrologic change or natural disasters at treatment works. This is a disaster-specific program limited to entities affected by Hurricane Helene in North Carolina.

Geographic Eligibility

All

Expert Tips

Project funding can have 20- to 30-year loan terms based on anticipated infrastructure life, so applicants should consider long-term infrastructure planning when scoping projects. Engage engineering consultants early since Engineering Report approval and Environmental Review are required crosscutters. Ensure compliance with American Iron and Steel and Davis-Bacon Wage requirements from project inception as crosscutters apply to the entire project. Review the webinar recording and slides available from NC DEQ for detailed guidance on application requirements. Since awards are announced on a rolling basis (December 2025 through April 2026), earlier submissions may receive faster review.

Key Dates

Application Opens

Not specified

Application Closes

March 2, 2026

Contact Information

Grantor

North Carolina Department of Environmental Quality (DEQ)

Subscribe to view contact details

Newsletter Required
Categories
Infrastructure
Disaster Prevention and Relief
Environment

Subscribe to access grant documents