Missouri grants for Exclusive - see details
Explore 2 grant opportunities
Application Deadline
Aug 15, 2025
Date Added
Jun 5, 2025
This grant provides financial assistance to community public water systems in Missouri to develop and implement plans that protect local water sources from contamination, ensuring access to safe drinking water.
Application Deadline
Jun 6, 2024
Date Added
Apr 6, 2024
The specific research question to be addressed by this agreement is How do bed material loads, hydraulic roughness, and bedform regimes change based on hydraulic parameters, such as temperature, shear stress, stream power, slope, water velocity, etc. To answer this complex research question, a bed material load sediment transport capacity function will be derived using the best available data, including USGS suspended sediment concentration/load and the Missouri River 2014 sediment data collection effort. A bedform/roughness predictor algorithm will also be developed for the Missouri River. The effectiveness of these algorithms at predicting observed data must be demonstrated in a journal article to be coauthored by USACE. The methodology and results must also be discussed in the journal article. Two in-person meetings will be held (kickoff and final presentation) between USACE and the award recipient, as well as monthly virtual meetings.